Case 1

Case 1

Redler installation. A redler is a closed transport system that uses a towing chain to move dry substances vertically.

Read more
Case 2

Case 2

Hoisting Pre-Treatment Tank in steel structure for an agro-industrial concern.

Read more
Case 3

Case 3

During a factory shut-down, various cranes were used for maintenance work, always with an eye on quality and safety. As a result, the factory can...

Read more
Case 4

Case 4

Dismantling of the control tower at the lock in Harelbeke

Read more
Case 5

Case 5

Lifting 35 metre-high stacker cranes into a high-bay warehouse. These stacker cranes will be used for the automatic storage of pallets with finished goods.

Read more
Case 6

Case 6

Shutdown Biomass Power Plant
Changing heat exchangers during maintenance work

Read more
Case 7

Case 7

Installation of extraction installations for the largest sawing installation in the furniture industry

Read more
Case 8

Case 8

Moving Wet Electrostatic Precipitator in the chipboard industry

Read more